Theme park smart power solution
Pain points of traditional theme park power distribution solutions
- Intelligent power management (safety, energy saving, etc.) can only be achieved by adding complex intelligent devices at all levels (such as adding line temperature sensors, residual current transformers, current sensors, self-resetting over- and under-voltage protectors, electrical fire alarms, etc.) to collect power consumption data.
- The solution lacks "intelligence" (ignition, load, three-phase balance, etc. cannot be monitored); "complex" (adding multiple devices), "monitoring but not control" (some scenarios cannot be processed remotely), and "limited scenarios" (different devices have different requirements for voltage, current, load, etc.).
[Innovation and Breakthrough] EXACT Theme Park Smart Power Solution
(I) Overview of EXACT Solution
- The highly integrated intelligent micro-break and the cloud platform behind it can directly monitor or supervise multi-level and multi-scenario online. In addition to electricians, leaders at all levels of theme parks and government fire departments can understand the power safety situation at any time.
- The power management is efficient, precise, and has no blind spots. The platform and APP can directly monitor various power consumption data of each device, such as leakage, sparking, overload, over-voltage and under-voltage, etc.; if the threshold is exceeded or the switch is not executed within the specified time, an alarm will be issued and the switch can be executed remotely.
- The power consumption plan can be flexibly adjusted at any time according to needs, and it can be freely adjusted. It has changed the old-fashioned power management method and is easy to add equipment.
- The solution is simple, the equipment is highly integrated, and the construction and maintenance are easy. Different smart circuit breakers can be selected according to the budget, key objects and scenarios.
(II) EXACT solution design
(III) EXACT solution highlights
- Can match various application scenarios: safety monitoring (temperature, short circuit, leakage); voltage and current stability monitoring (over-voltage, under-current, three-phase imbalance); equipment active power monitoring; load monitoring; remote opening and closing, etc.;
- Simple deployment and low implementation cost: There is no need to add "residual current transformer" and "temperature sensor" to the back end of the meter. The highly integrated single device has low installation space requirements and low construction difficulty.
- Maintenance is simple and direct, and can be maintained remotely: maintenance positioning is simple and fast; the system automatically conducts inspections; reduces the workload of electricians and reduces professional level requirements
- High safety: the opening and closing function not only ensures circuit short circuit, but also ensures automatic processing of safety alarms such as over-temperature, sparking, over-current, over-voltage, and leakage.
- High reliability: high acquisition accuracy; remote control function, the speed of problem processing is exponentially improved; different data return methods can be used according to the on-site environment; the equipment integration should be high, and a single device can complete all intelligent functions to improve equipment reliability.